Duration, cost, team: what really drives the effort of a migration

Table of contents

Store Migration Without Ranking or Revenue Loss

"What does a migration cost?" is the first question in almost every conversation. There is no honest answer without an analysis. A 300-product store from WooCommerce and a B2B store with 80,000 items, three countries and ERP integration from Spryker have little in common apart from the word "migration".

In short: There are no serious flat prices for a store migration. The effort is driven by data volume and quality, number of interfaces, custom features, design and the number of languages and countries. A reliable figure only emerges after assessing the store, interfaces and goals.

Why flat prices are useless

A price range stretching from a small store to an enterprise project doesn't help you make any decision. A figure only becomes reliable once it is clear what will be transferred, what will be rebuilt and what will deliberately be dropped. Serious proposals are therefore based on an analysis of your current store, not on the number of products.

The cost drivers

  • Custom features: Every piece of special logic in the old store, such as configurators, pricing rules per customer group or custom checkout steps, has to be rebuilt or replaced in the new system. This is usually the largest item.

  • Interfaces: ERP, PIM, shipping providers, marketplaces, POS systems. Is there a ready-made connector for the target system, or does the interface have to be newly developed?

  • Data quality: Duplicate customers, inconsistent variants, missing GTINs, manufacturers in the wrong field. What was tolerated in the old system becomes visible during the transfer.

  • Countries, languages, domains: Every language version needs its own redirects, copy and checks.

  • Design: Taking over the existing design, adapting a standard theme or a completely new design.

  • Scope of redirects: A store with many filter and variant pages in Google's index needs more elaborate mapping than a small catalog.

How long it takes

Duration depends on the same factors. At arboro, migrations from Shopware 5 to Shopware 6 or Shopify take two to six months in practice. Moves from enterprise systems with many interfaces take longer, small catalogs without special logic less. The schedule is built backwards from the desired go-live, with a buffer for tests and no go-live during the highest-revenue weeks.

Costs often missing from proposals

  • Parallel operation: For a few weeks, old and new systems run at the same time, with double costs for hosting, licenses and apps.

  • Recurring fees: apps, extensions and licenses in the new system.

  • Content: copy, images and landing pages that are not transferred automatically.

  • Rework after go-live: corrections to redirects, feeds and tracking in the first weeks.

  • Ad budget: A short learning phase in Google Ads can temporarily raise the cost per order if product IDs can't be kept.

The team

On your side, a migration needs less technology than decision-making power:

Role

Task

Decision-maker

sets goals and priorities, approves go-live

Internal project owner

collects requirements, tests, coordinates departments

Agency: development

data transfer, theme, extensions, interfaces

Agency: SEO

URL inventory, redirects, structured data, monitoring

Agency: SEA and tracking

Merchant Center, product IDs, conversions, campaigns

External partners

ERP, payment providers, shipping

A common mistake: SEO and Google Ads are only brought in shortly before go-live. By then, the decisions affecting rankings and advertising history have long been made. Both belong in the project from the start.

How to get a reliable figure

Before the proposal, have your current store analyzed: features, interfaces, data quality, URL inventory and ad accounts. Only then can a plan with effort, schedule and risks be drawn up that you can compare. At arboro, it always starts with a conversation in which Zoran Artmagic or a senior expert from his team reviews your situation. The next steps follow from that, tailored to your store.

The typical project flow

Phase

What happens

Result you should see

1. Assessment

store, data, plugins or apps, interfaces, rankings and campaigns are recorded

list of all features, interfaces and risks

2. Concept

target system, data model, URL strategy, ID strategy, tracking concept

redirect and ID concept in writing

3. Implementation

theme, extensions, interfaces

test system you can use yourself

4. Test migrations

data is transferred, checked and corrected several times

log of what was transferred and what wasn't

5. Acceptance and dress rehearsal

test purchases, redirect test, feed comparison, complete trial run

signed acceptance against criteria

6. Go-live

change freeze, delta migration, switchover, checklist

store live, checklist ticked off

7. Support after go-live

daily and weekly checks, corrections

report after 30, 60 and 90 days

Phases 1 and 2 are the cheapest and most effective. Errors found here cost hours. The same errors after go-live cost revenue.

Where projects fall behind schedule

  • Data quality: legacy data with inconsistent variants, missing SKUs or duplicate customers usually only shows up in the first test migration.

  • Interfaces: ERP, shipping and payment providers have their own schedules. A missing access can cost a week.

  • Decisions: open questions about range, design or features block the team. Appoint one person who makes binding decisions.

  • Content: category texts, guides and images are often moved "later". Later means after go-live, and then they are missing from Google.

What you can check today

  1. Do you have a list of all special features and interfaces of your current store?

  2. Does the proposal include parallel operation, recurring fees and rework after go-live?

  3. Are SEO and Google Ads involved from the first day of the project?

  4. Is there someone on your side who has time for tests and coordination?

Frequently asked questions

That can only be answered seriously after an analysis. Costs depend mainly on special features, interfaces, data quality, number of countries and design. A store with few products and no special logic is a different project from a B2B store with ERP integration and several countries.

At arboro, migrations from Shopware 5 take two to six months in practice. Projects with many interfaces or from enterprise systems take longer. Plan backwards from go-live, with a buffer for testing.

Parallel operation, recurring app and license fees, content and rework after go-live. A short learning phase in Google Ads may be added if product IDs change.

Because the effort depends almost entirely on your store. A small WooCommerce store without interfaces and a B2B store with ERP, several countries and custom development have nothing in common except the word migration. A reliable figure only exists after the conversation and the assessment.

Besides theme and data transfer: URL inventory, redirect mapping, ID concept, tracking, test purchases and support after go-live. If one of these is missing, it isn't missing from the project – it shows up later as a change request or as lost revenue.